Triple
T4108158
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tabqa Dam |
E88504
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | irrigation infrastructure |
C8943
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: irrigation infrastructure Context triple: [Tabqa Dam, instanceOf, irrigation infrastructure]
-
A.
irrigation dam
chosen
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
B.
drinking water infrastructure
Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
-
C.
water management project
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
D.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
-
E.
water management structure
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9484fb881909146f4c772ad277c |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:40 p.m.