Triple
T4108046
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nueva Ecija |
E88501
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Pantabangan Dam
Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
|
E418015
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pantabangan Dam | Statement: [Nueva Ecija, hasDam, Pantabangan Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pantabangan Dam Context triple: [Nueva Ecija, hasDam, Pantabangan Dam]
-
A.
Wlingi Dam
Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
-
B.
Pangue Dam
Pangue Dam is a major hydroelectric power facility in Chile, built on the Biobío River to generate electricity and support the country’s energy needs.
-
C.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
-
D.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
E.
Macagua Dam
Macagua Dam is a major hydroelectric dam complex in Venezuela that forms part of the Guri–Macagua–Caruachi system generating power from the Caroní River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Pantabangan Dam Triple: [Nueva Ecija, hasDam, Pantabangan Dam]
Generated description
Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Pantabangan Dam Target entity description: Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
-
A.
Wlingi Dam
Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
-
B.
Pangue Dam
Pangue Dam is a major hydroelectric power facility in Chile, built on the Biobío River to generate electricity and support the country’s energy needs.
-
C.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
-
D.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
E.
Macagua Dam
Macagua Dam is a major hydroelectric dam complex in Venezuela that forms part of the Guri–Macagua–Caruachi system generating power from the Caroní River.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9484fb881909146f4c772ad277c |
completed | March 9, 2026, 2:29 p.m. |
| NER | Named-entity recognition | batch_69af019e23c481909578eba1c9270282 |
completed | March 9, 2026, 5:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b57f1f8ca0819090fb2acb3fe03d14 |
completed | March 14, 2026, 3:30 p.m. |
| NEDg | Description generation | batch_69b582f9c858819094de05e240c98594 |
completed | March 14, 2026, 3:47 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b5836543848190abbf31c04804358d |
completed | March 14, 2026, 3:48 p.m. |
Created at: March 9, 2026, 3:40 p.m.