Triple

T4089039
Position Surface form Disambiguated ID Type / Status
Subject Joint Comprehensive Plan of Action E87659 entity
Predicate establishesBody P986 FINISHED
Object Joint Commission under the JCPOA
The Joint Commission under the JCPOA is the multilateral oversight and dispute-resolution body responsible for monitoring and coordinating implementation of the Iran nuclear agreement among its signatories.
E87659 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Joint Commission under the JCPOA | Statement: [Joint Comprehensive Plan of Action, establishesBody, Joint Commission under the JCPOA]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Joint Commission under the JCPOA
Context triple: [Joint Comprehensive Plan of Action, establishesBody, Joint Commission under the JCPOA]
  • A. Iran nuclear deal (Joint Comprehensive Plan of Action)
    The Iran nuclear deal, formally known as the Joint Comprehensive Plan of Action, is a 2015 agreement between Iran and major world powers aimed at limiting Iran’s nuclear program in exchange for sanctions relief.
  • B. Joint Committee on Atomic Energy
    The Joint Committee on Atomic Energy was a powerful U.S. congressional committee that oversaw and shaped national policy on nuclear energy and atomic weapons during the early Cold War era.
  • C. Interim Committee on nuclear policy
    The Interim Committee on nuclear policy was a high-level advisory body established by the U.S. government during World War II to guide decisions on the development and potential use of atomic weapons.
  • D. UNSMIL
    UNSMIL is the United Nations Support Mission in Libya, a UN political mission tasked with supporting Libya’s political transition, peace process, and institution-building efforts.
  • E. United Nations Sanctions Committees
    The United Nations Sanctions Committees are subsidiary bodies of the UN Security Council that oversee and monitor the implementation of sanctions regimes imposed on states, entities, and individuals to maintain or restore international peace and security.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Joint Commission under the JCPOA
Triple: [Joint Comprehensive Plan of Action, establishesBody, Joint Commission under the JCPOA]
Generated description
The Joint Commission under the JCPOA is the multilateral oversight and dispute-resolution body responsible for monitoring and coordinating implementation of the Iran nuclear agreement among its signatories.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Joint Commission under the JCPOA
Target entity description: The Joint Commission under the JCPOA is the multilateral oversight and dispute-resolution body responsible for monitoring and coordinating implementation of the Iran nuclear agreement among its signatories.
  • A. Iran nuclear deal (Joint Comprehensive Plan of Action) chosen
    The Iran nuclear deal, formally known as the Joint Comprehensive Plan of Action, is a 2015 agreement between Iran and major world powers aimed at limiting Iran’s nuclear program in exchange for sanctions relief.
  • B. Joint Committee on Atomic Energy
    The Joint Committee on Atomic Energy was a powerful U.S. congressional committee that oversaw and shaped national policy on nuclear energy and atomic weapons during the early Cold War era.
  • C. Interim Committee on nuclear policy
    The Interim Committee on nuclear policy was a high-level advisory body established by the U.S. government during World War II to guide decisions on the development and potential use of atomic weapons.
  • D. UNSMIL
    UNSMIL is the United Nations Support Mission in Libya, a UN political mission tasked with supporting Libya’s political transition, peace process, and institution-building efforts.
  • E. United Nations Sanctions Committees
    The United Nations Sanctions Committees are subsidiary bodies of the UN Security Council that oversee and monitor the implementation of sanctions regimes imposed on states, entities, and individuals to maintain or restore international peace and security.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed94425148190be337845d56fac22 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aefca9e9088190a97cb2ccb5d622f0 completed March 9, 2026, 5 p.m.
NED1 Entity disambiguation (via context triple) batch_69b56b6651d48190915581eca783cf3b completed March 14, 2026, 2:06 p.m.
NEDg Description generation batch_69b56c4c41c88190b00ab8fc43686afb completed March 14, 2026, 2:10 p.m.
NED2 Entity disambiguation (via description) batch_69b56cc2ae948190a5e13992626dd547 completed March 14, 2026, 2:12 p.m.
Created at: March 9, 2026, 3:39 p.m.