Triple

T4075325
Position Surface form Disambiguated ID Type / Status
Subject integrated into Fürth city center street network E86750 entity
Predicate instanceOf P0 FINISHED
Object transportation-related concept C2519 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation-related concept
Context triple: [integrated into Fürth city center street network, instanceOf, transportation-related concept]
  • A. transportation organization
    A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
  • B. transportation route chosen
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • C. transportation standard
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • D. transportation service
    A transportation service is a system or business that moves people or goods from one location to another using various modes of transport under defined schedules, routes, and conditions.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93ebe448190a1f1686e28740ac9 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:39 p.m.