Triple
T4038736
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ponte Milvio |
E83890
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Roman bridge |
C6858
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Roman bridge Context triple: [Ponte Milvio, instanceOf, Roman bridge]
-
A.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
-
B.
ancient Roman structure
chosen
An ancient Roman structure is a man-made construction from the Roman civilization, such as temples, amphitheaters, aqueducts, or baths, characterized by advanced engineering, arches, and durable materials like stone and concrete.
-
C.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
D.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
E.
swing aqueduct
A swing aqueduct is a movable water bridge that pivots horizontally to allow both canal traffic across a gap and the passage of boats or vehicles beneath by swinging out of the way.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed92f7cf0819098e0539bdcc3767f |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:37 p.m.