Triple

T4035864
Position Surface form Disambiguated ID Type / Status
Subject Type 26 frigate E83824 entity
Predicate programmeStatus P22823 FINISHED
Object under construction LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: under construction | Statement: [Type 26 frigate, programmeStatus, under construction]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: programmeStatus
Context triple: [Type 26 frigate, programmeStatus, under construction]
  • A. programStatus chosen
    Indicates the current state or condition of a program within its lifecycle (e.g., planned, active, paused, completed, or terminated).
  • B. hasProgramme
    Indicates that an entity is associated with or offers a particular programme (such as a course of study, plan, or structured set of activities).
  • C. programmeName
    Indicates that an entity has or is identified by a specific programme’s name.
  • D. agencyProgramme
    Indicates that an agency is responsible for, manages, or is associated with a particular programme.
  • E. OlympicProgramStatus
    Indicates whether and how a sport or event is included in the official program of the Olympic Games (e.g., core, provisional, or not included).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed92f7cf0819098e0539bdcc3767f completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aefb132f6c8190937acd35a6a5a9e4 completed March 9, 2026, 4:53 p.m.
PD Predicate disambiguation batch_69aef8fe440c819093a7fa22c4ff3f1a completed March 9, 2026, 4:44 p.m.
Created at: March 9, 2026, 3:36 p.m.