Triple
T4028754
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | File on 4 |
E83655
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | investigative journalism programme |
C4747
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: investigative journalism programme Context triple: [File on 4, instanceOf, investigative journalism programme]
-
A.
investigative journalism team
An investigative journalism team is a collaborative group of reporters, editors, and researchers who systematically uncover, verify, and report hidden or complex information in the public interest.
-
B.
television news program
A television news program is a scheduled broadcast that presents current events and information through anchors, reporters, and visual media to inform the viewing audience.
-
C.
news and talk program
chosen
A news and talk program is a broadcast show that presents current events and issues through news reports, interviews, discussions, and commentary.
-
D.
journalistic work
A journalistic work is a researched, fact-based piece of communication produced to inform, analyze, or explain current or relevant events for a public audience.
-
E.
documentary photography program
A documentary photography program is a structured course or initiative that teaches photographers to authentically capture real-life events, people, and social issues through visual storytelling.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed92e29ac819080f7a98b594fec05 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:36 p.m.