Triple

T4022009
Position Surface form Disambiguated ID Type / Status
Subject alternating current power system E91299 entity
Predicate instanceOf P0 FINISHED
Object power grid architecture C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power grid architecture
Context triple: [alternating current power system, instanceOf, power grid architecture]
  • A. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • B. grid-scale battery energy storage system
    A grid-scale battery energy storage system is a large, utility-level installation that stores electrical energy in batteries to balance supply and demand, enhance grid stability, and support the integration of variable renewable energy sources.
  • C. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • D. network architecture
    A network architecture is the structured design and organization of hardware, software, protocols, and communication paths that define how data flows and services are delivered within a computer network.
  • E. battery electric vehicle architecture
    Battery electric vehicle architecture is the integrated system design that defines how the battery pack, electric drivetrain, power electronics, control systems, and supporting components are configured and interact to deliver propulsion, safety, efficiency, and functionality in an all-electric vehicle.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9618b04819081750d979d2af098 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:35 p.m.