Triple
T4022008
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | alternating current power system |
E91299
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electrical power system |
C7916
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electrical power system Context triple: [alternating current power system, instanceOf, electrical power system]
-
A.
power system
chosen
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
D.
balance of power system
A balance of power system is an international relations arrangement in which states form shifting alliances and counterweights so that no single actor becomes dominant enough to threaten the independence or security of the others.
-
E.
energy storage system
An energy storage system is a device or group of devices that capture, store, and release energy for later use to improve reliability, efficiency, and flexibility of power supply.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9618b04819081750d979d2af098 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:35 p.m.