Triple

T4016218
Position Surface form Disambiguated ID Type / Status
Subject IEEE 802.1Qfy E90766 entity
Predicate instanceOf P0 FINISHED
Object bridged network standard C10666 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridged network standard
Context triple: [IEEE 802.1Qfy, instanceOf, bridged network standard]
  • A. bridge network
    A bridge network is a system of interconnected bridges and links that provides multiple paths for traffic or data to travel between nodes, enhancing reliability and load distribution.
  • B. virtualization networking standard chosen
    A virtualization networking standard defines the protocols, interfaces, and best practices that enable consistent, interoperable, and secure network connectivity across virtualized environments and platforms.
  • C. network connector
    A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
  • D. bridge approach
    A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
  • E. gaseous bridge
    A gaseous bridge is a transient, elongated structure of gas that connects two separate regions or bodies, enabling the transfer of matter, energy, or information between them.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95e44088190aff7d90a151b1b20 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:35 p.m.