Triple

T4015562
Position Surface form Disambiguated ID Type / Status
Subject South Terminal E90746 entity
Predicate partOfTransportInfrastructure P19374 FINISHED
Object London air transport network LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: London air transport network | Statement: [South Terminal, partOfTransportInfrastructure, London air transport network]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfTransportInfrastructure
Context triple: [South Terminal, partOfTransportInfrastructure, London air transport network]
  • A. isPartOfInfrastructure chosen
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • B. operatorOfTransportInfrastructure
    Indicates that an entity operates, manages, or runs a specific piece of transport infrastructure.
  • C. usedTransportationInfrastructure
    Indicates that an entity made use of some form of transportation infrastructure (such as roads, railways, or ports) to enable movement or transit.
  • D. transportationFacility
    Indicates that one entity is a facility or location used for the transportation or transit of people or goods in relation to another entity.
  • E. partOfTransitSystem
    Indicates that something is a component or segment within a larger transit or transportation system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95e44088190aff7d90a151b1b20 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aefaec08dc8190a341809059554f84 completed March 9, 2026, 4:53 p.m.
PD Predicate disambiguation batch_69aef8fa6fec81909b1190ecbba61410 completed March 9, 2026, 4:44 p.m.
Created at: March 9, 2026, 3:35 p.m.