Triple
T4012922
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vanguard program |
E90687
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | United States satellite program |
C9200
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: United States satellite program Context triple: [Vanguard program, instanceOf, United States satellite program]
-
A.
satellite program
chosen
A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
-
B.
polar-orbiting weather satellite program
A polar-orbiting weather satellite program is a coordinated system of satellites in near-polar orbits that provide global, high-resolution observations of atmospheric, oceanic, and surface conditions for weather forecasting and climate monitoring.
-
C.
space technology development program
A space technology development program is an organized initiative that researches, designs, tests, and matures advanced space-related technologies to enable or enhance future space missions and capabilities.
-
D.
NASA space observatory program
A NASA space observatory program is a coordinated series of space-based telescopes and instruments designed, launched, and operated to observe the universe across various wavelengths for scientific research and discovery.
-
E.
United States government program
A United States government program is an organized set of activities, services, or regulations funded and administered by federal agencies to achieve specific public policy goals or address national needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95e44088190aff7d90a151b1b20 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:35 p.m.