Triple
T3990552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Deer Island Wastewater Treatment Plant |
E86978
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sewage treatment plant |
C4822
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sewage treatment plant Context triple: [Deer Island Wastewater Treatment Plant, instanceOf, sewage treatment plant]
-
A.
sewer utility
A sewer utility is an organization or system responsible for collecting, transporting, treating, and safely disposing of wastewater and sewage from homes, businesses, and industries.
-
B.
water purification device
A water purification device is a system or apparatus designed to remove contaminants and impurities from water to make it safe and suitable for specific uses such as drinking, cooking, or industrial processes.
-
C.
industrial plant
chosen
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
D.
water pollution control program
A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
-
E.
municipal water supply facility
A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed93fd9d4819085d3b2137d2346cb |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:33 p.m.