Triple

T3961724
Position Surface form Disambiguated ID Type / Status
Subject Calico Ghost Town E85919 entity
Predicate instanceOf P0 FINISHED
Object ghost town C4642 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ghost town
Context triple: [Calico Ghost Town, instanceOf, ghost town]
  • A. former town
    A former town is a once-recognized populated settlement that has lost its official town status due to abandonment, depopulation, annexation, or administrative reorganization.
  • B. shantytown
    A shantytown is an informal, densely populated settlement of makeshift housing, typically lacking secure tenure and basic services, that develops on the margins of urban areas.
  • C. rural town
    A rural town is a small, sparsely populated community situated in the countryside, typically characterized by close-knit social ties, limited infrastructure, and an economy often based on agriculture or local resource industries.
  • D. former mining town chosen
    A former mining town is a community that once relied heavily on mineral extraction as its primary economic activity but has since seen its mines close, often leading to economic, social, and environmental transitions.
  • E. former village
    A former village is a once-inhabited settlement that has lost its status or population as a village, often due to abandonment, depopulation, or administrative reclassification.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed93a96908190bcbdbfa718f155bd completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:31 p.m.