Triple

T395496
Position Surface form Disambiguated ID Type / Status
Subject Voyager 2 E8973 entity
Predicate missionPhase P8100 FINISHED
Object interstellar mission LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: interstellar mission | Statement: [Voyager 2, missionPhase, interstellar mission]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: missionPhase
Context triple: [Voyager 2, missionPhase, interstellar mission]
  • A. mission
    Indicates that an entity is assigned or engaged in a specific task, operation, or purpose-directed undertaking.
  • B. currentMissionPhase chosen
    Indicates the specific phase or stage that a mission is presently in within its overall lifecycle.
  • C. missionCadence
    Indicates the frequency or regular interval at which missions are planned, launched, or conducted.
  • D. majorCapturePhase
    Indicates a significant or primary stage in a capture process where the main act of seizing, acquiring, or taking control occurs.
  • E. missionExtension
    Indicates that an existing mission is being prolonged beyond its originally planned duration or scope.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f55c60819097aff65ea2ca2832 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2ec792dd081909b6b18a854139f8c completed Feb. 28, 2026, 1:24 p.m.
PD Predicate disambiguation batch_69a2e96bd3848190a66ca14dfbd26da5 completed Feb. 28, 2026, 1:11 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.