Triple

T3951174
Position Surface form Disambiguated ID Type / Status
Subject A2 coastal highway E84867 entity
Predicate hasJunctionWith P1018 FINISHED
Object A17 highway E562359 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A17 highway | Statement: [A2 coastal highway, hasJunctionWith, A17 highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A17 highway
Context triple: [A2 coastal highway, hasJunctionWith, A17 highway]
  • A. A2 highway
    The A2 highway is a major roadway in Nigeria that serves as a key transport corridor connecting Kaduna with other important cities and regions.
  • B. A3 highway
    The A3 highway is a major Nigerian roadway that runs through several northern states, including Bauchi, serving as an important regional transport corridor.
  • C. A3 highway
    The A3 highway is a major roadway in Zimbabwe that serves as a key transport route linking the city of Mutare with other important regions and border crossings.
  • D. A1 highway
    The A1 highway is a major north–south road in Botswana that connects key cities including Francistown and serves as a primary route for regional and cross-border traffic.
  • E. A4 highway chosen
    The A4 highway is a major road route that connects with the A2 coastal highway, serving as an important link in the regional transportation network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed934fbfc8190847068e4546de963 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aef9384cdc8190ad89b32dc25ac1d7 completed March 9, 2026, 4:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69c11c83f8bc8190bdf139c9da2dd66b completed March 23, 2026, 10:57 a.m.
Created at: March 9, 2026, 3:30 p.m.