Triple

T3932704
Position Surface form Disambiguated ID Type / Status
Subject Ouistreham E90830 entity
Predicate hasRoadConnection P385 FINISHED
Object A13 via Caen E259545 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A13 via Caen | Statement: [Ouistreham, hasRoadConnection, A13 via Caen]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A13 via Caen
Context triple: [Ouistreham, hasRoadConnection, A13 via Caen]
  • A. Paris–Caen–Cherbourg
    Paris–Caen–Cherbourg is a French intercity rail route linking the capital Paris with the Normandy cities of Caen and Cherbourg.
  • B. French A8 motorway
    The French A8 motorway is a major autoroute in southeastern France that runs along the Mediterranean coast, linking cities such as Aix-en-Provence and Nice to the Italian border.
  • C. A3 autoroute
    The A3 autoroute is a short French motorway in the Île-de-France region that connects Paris to its northeastern suburbs and links major radial routes around the capital.
  • D. Paris–Limoges–Toulouse
    Paris–Limoges–Toulouse is a major French intercity rail corridor linking the capital Paris with the central city of Limoges and the southwestern city of Toulouse.
  • E. Autoroute A13 chosen
    Autoroute A13 is a major French motorway linking Paris to Normandy, serving as one of the country’s oldest and most heavily used expressways.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed95f26e0819094b0e71974543a19 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeedaaf3c881909539831bf3a8bf10 completed March 9, 2026, 3:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69b52887d4a48190b51df3f51ff197c0 completed March 14, 2026, 9:21 a.m.
Created at: March 9, 2026, 3:23 p.m.