Triple
T3931429
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jiayuguan Pass |
E90802
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Great Wall pass |
C875
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Great Wall pass Context triple: [Jiayuguan Pass, instanceOf, Great Wall pass]
-
A.
mountain pass
A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
-
B.
cross-sea bridge
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
C.
line of fortifications
chosen
A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
-
D.
Inca road system
The Inca road system was an extensive, sophisticated network of paved and unpaved routes spanning thousands of kilometers across the Andes, designed to connect and administer the vast Inca Empire through efficient communication, trade, and military movement.
-
E.
granite bridge
A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95f26e0819094b0e71974543a19 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:23 p.m.