Triple
T3928493
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Antonio River Walk |
E93335
|
entity |
| Predicate | significantEvent |
P259
|
FINISHED |
| Object |
Mission Reach ecosystem restoration project
The Mission Reach ecosystem restoration project is a large-scale environmental and recreational initiative that transformed an eight-mile stretch of the San Antonio River into a restored natural habitat with trails, native vegetation, and improved flood control.
|
E399836
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mission Reach ecosystem restoration project | Statement: [San Antonio River Walk, significantEvent, Mission Reach ecosystem restoration project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mission Reach ecosystem restoration project Context triple: [San Antonio River Walk, significantEvent, Mission Reach ecosystem restoration project]
-
A.
Muddy River Restoration Project
The Muddy River Restoration Project is an environmental and flood-control initiative focused on rehabilitating the Muddy River’s ecosystem, improving water quality, and reducing storm-related flooding in its surrounding urban areas.
-
B.
Environmental Restoration Program (New York State)
The Environmental Restoration Program (New York State) is a state initiative that funds and oversees the investigation and cleanup of contaminated properties, particularly municipally owned brownfields, to promote environmental health and community redevelopment.
-
C.
Los Angeles River Ecosystem Restoration project
The Los Angeles River Ecosystem Restoration project is a large-scale environmental initiative aimed at revitalizing the Los Angeles River’s natural habitats, improving flood management, and expanding public access to green space along its corridor.
-
D.
Salton Sea Restoration Program
The Salton Sea Restoration Program is a long-term environmental initiative aimed at addressing ecological degradation, public health risks, and habitat loss at California’s Salton Sea through water management, habitat creation, and dust control projects.
-
E.
coastal wetlands restoration program
The coastal wetlands restoration program is a Massachusetts state initiative focused on restoring and enhancing degraded coastal wetlands to improve ecological health, resilience, and public benefits.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mission Reach ecosystem restoration project Triple: [San Antonio River Walk, significantEvent, Mission Reach ecosystem restoration project]
Generated description
The Mission Reach ecosystem restoration project is a large-scale environmental and recreational initiative that transformed an eight-mile stretch of the San Antonio River into a restored natural habitat with trails, native vegetation, and improved flood control.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Mission Reach ecosystem restoration project Target entity description: The Mission Reach ecosystem restoration project is a large-scale environmental and recreational initiative that transformed an eight-mile stretch of the San Antonio River into a restored natural habitat with trails, native vegetation, and improved flood control.
-
A.
Muddy River Restoration Project
The Muddy River Restoration Project is an environmental and flood-control initiative focused on rehabilitating the Muddy River’s ecosystem, improving water quality, and reducing storm-related flooding in its surrounding urban areas.
-
B.
Environmental Restoration Program (New York State)
The Environmental Restoration Program (New York State) is a state initiative that funds and oversees the investigation and cleanup of contaminated properties, particularly municipally owned brownfields, to promote environmental health and community redevelopment.
-
C.
Los Angeles River Ecosystem Restoration project
The Los Angeles River Ecosystem Restoration project is a large-scale environmental initiative aimed at revitalizing the Los Angeles River’s natural habitats, improving flood management, and expanding public access to green space along its corridor.
-
D.
Salton Sea Restoration Program
The Salton Sea Restoration Program is a long-term environmental initiative aimed at addressing ecological degradation, public health risks, and habitat loss at California’s Salton Sea through water management, habitat creation, and dust control projects.
-
E.
coastal wetlands restoration program
The coastal wetlands restoration program is a Massachusetts state initiative focused on restoring and enhancing degraded coastal wetlands to improve ecological health, resilience, and public benefits.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed96bfa1081908f7b30f2c647dee6 |
completed | March 9, 2026, 2:30 p.m. |
| NER | Named-entity recognition | batch_69aeeda65b708190b24cd715915aec1d |
completed | March 9, 2026, 3:56 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b5287b8d548190a929f14637cb9963 |
completed | March 14, 2026, 9:20 a.m. |
| NEDg | Description generation | batch_69b529ad13d48190995ed79d3c41a69b |
completed | March 14, 2026, 9:26 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69b52a5274ec8190b481a2627e94addb |
completed | March 14, 2026, 9:28 a.m. |
Created at: March 9, 2026, 3:23 p.m.