Triple
T3927696
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | King Street Trolley |
E93316
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | circulator shuttle |
C910
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: circulator shuttle Context triple: [King Street Trolley, instanceOf, circulator shuttle]
-
A.
people mover system
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
B.
rapid transit vehicle
A rapid transit vehicle is a high-capacity, electrically powered rail car or train designed to provide frequent, fast, and reliable urban or suburban passenger transportation on dedicated or grade-separated tracks.
-
C.
streetcar system
chosen
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
D.
auto ferry train
An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
-
E.
monorail station
A monorail station is a designated facility where passengers board, alight, and transfer to monorail trains, typically featuring elevated platforms, access structures, and passenger amenities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed96bfa1081908f7b30f2c647dee6 |
completed | March 9, 2026, 2:30 p.m. |
Created at: March 9, 2026, 3:23 p.m.