Triple

T3927011
Position Surface form Disambiguated ID Type / Status
Subject Piers 30–32 E93299 entity
Predicate instanceOf P0 FINISHED
Object maritime facility C10623 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maritime facility
Context triple: [Piers 30–32, instanceOf, maritime facility]
  • A. shipbuilding facility
    A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
  • B. maritime warehouse chosen
    A maritime warehouse is a specialized storage facility located at or near a port, designed to handle, protect, and manage goods transported by sea, including loading, unloading, and temporary holding of cargo.
  • C. maritime passage
    A maritime passage is a navigable sea route or waterway that connects larger bodies of water, enabling the movement of ships and maritime traffic between regions.
  • D. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • E. fishing port
    A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed96bfa1081908f7b30f2c647dee6 completed March 9, 2026, 2:30 p.m.
Created at: March 9, 2026, 3:23 p.m.