Triple

T3925336
Position Surface form Disambiguated ID Type / Status
Subject Areva E93261 entity
Predicate instanceOf P0 FINISHED
Object nuclear industry company C14601 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear industry company
Context triple: [Areva, instanceOf, nuclear industry company]
  • A. multinational utility company
    A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
  • B. integrated energy company
    An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
  • C. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • D. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • E. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed96bfa1081908f7b30f2c647dee6 completed March 9, 2026, 2:30 p.m.
Created at: March 9, 2026, 3:23 p.m.