Triple
T3911429
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Space Shuttle ISS assembly flights |
E87328
|
entity |
| Predicate | notableFlight |
P22
|
FINISHED |
| Object |
STS-130
STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
|
E429088
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-130 | Statement: [Space Shuttle ISS assembly flights, notableFlight, STS-130]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-130 Context triple: [Space Shuttle ISS assembly flights, notableFlight, STS-130]
-
A.
STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
-
B.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
-
C.
STS-128
STS-128 was a 2009 NASA Space Shuttle Discovery mission to the International Space Station that delivered supplies, equipment, and a new crew member as part of the station’s assembly and resupply efforts.
-
D.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
E.
STS-118
STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-130 Triple: [Space Shuttle ISS assembly flights, notableFlight, STS-130]
Generated description
STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: STS-130 Target entity description: STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
-
A.
STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
-
B.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
-
C.
STS-128
STS-128 was a 2009 NASA Space Shuttle Discovery mission to the International Space Station that delivered supplies, equipment, and a new crew member as part of the station’s assembly and resupply efforts.
-
D.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
E.
STS-118
STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed9424514819086e9c58adde6652d |
completed | March 9, 2026, 2:29 p.m. |
| NER | Named-entity recognition | batch_69aeed35e2d081908b5d87c7630e7ffc |
completed | March 9, 2026, 3:54 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b5c6ed5910819095de0dce09bd50b8 |
completed | March 14, 2026, 8:37 p.m. |
| NEDg | Description generation | batch_69b5c779d28c81909fdb37adb045684c |
completed | March 14, 2026, 8:39 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b5c7f6195481909167c972e1838cc9 |
completed | March 14, 2026, 8:41 p.m. |
Created at: March 9, 2026, 3:22 p.m.