Triple

T3911429
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle ISS assembly flights E87328 entity
Predicate notableFlight P22 FINISHED
Object STS-130
STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
E429088 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-130 | Statement: [Space Shuttle ISS assembly flights, notableFlight, STS-130]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-130
Context triple: [Space Shuttle ISS assembly flights, notableFlight, STS-130]
  • A. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • B. STS-134
    STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
  • C. STS-128
    STS-128 was a 2009 NASA Space Shuttle Discovery mission to the International Space Station that delivered supplies, equipment, and a new crew member as part of the station’s assembly and resupply efforts.
  • D. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • E. STS-118
    STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-130
Triple: [Space Shuttle ISS assembly flights, notableFlight, STS-130]
Generated description
STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-130
Target entity description: STS-130 was a 2010 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Tranquility node and the Cupola observatory module.
  • A. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • B. STS-134
    STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
  • C. STS-128
    STS-128 was a 2009 NASA Space Shuttle Discovery mission to the International Space Station that delivered supplies, equipment, and a new crew member as part of the station’s assembly and resupply efforts.
  • D. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • E. STS-118
    STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9424514819086e9c58adde6652d completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeed35e2d081908b5d87c7630e7ffc completed March 9, 2026, 3:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5c6ed5910819095de0dce09bd50b8 completed March 14, 2026, 8:37 p.m.
NEDg Description generation batch_69b5c779d28c81909fdb37adb045684c completed March 14, 2026, 8:39 p.m.
NED2 Entity disambiguation (via description) batch_69b5c7f6195481909167c972e1838cc9 completed March 14, 2026, 8:41 p.m.
Created at: March 9, 2026, 3:22 p.m.