Triple

T3911426
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle ISS assembly flights E87328 entity
Predicate notableFlight P22 FINISHED
Object STS-127 E251477 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-127 | Statement: [Space Shuttle ISS assembly flights, notableFlight, STS-127]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-127
Context triple: [Space Shuttle ISS assembly flights, notableFlight, STS-127]
  • A. STS-127 chosen
    STS-127 was a 2009 NASA Space Shuttle Endeavour mission to the International Space Station that delivered and assembled key components of Japan’s Kibo laboratory.
  • B. STS-124
    STS-124 was a NASA Space Shuttle Discovery mission to the International Space Station in 2008 that delivered and installed Japan’s Kibo laboratory module.
  • C. STS-122
    STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
  • D. STS-123
    STS-123 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2008 that delivered key components including Japan’s Kibo logistics module and the Canadian-built Dextre robotic system.
  • E. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9424514819086e9c58adde6652d completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeed35e2d081908b5d87c7630e7ffc completed March 9, 2026, 3:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69b595f59e908190a45b3b9c767974fb completed March 14, 2026, 5:08 p.m.
Created at: March 9, 2026, 3:22 p.m.