Triple

T3911420
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle ISS assembly flights E87328 entity
Predicate notableFlight P22 FINISHED
Object STS-118
STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
E408044 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-118 | Statement: [Space Shuttle ISS assembly flights, notableFlight, STS-118]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-118
Context triple: [Space Shuttle ISS assembly flights, notableFlight, STS-118]
  • A. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • B. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • C. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • D. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • E. STS-108
    STS-108 was a NASA Space Shuttle Endeavour mission in December 2001 that delivered supplies and a new crew to the International Space Station as part of the ISS assembly and logistics program.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-118
Triple: [Space Shuttle ISS assembly flights, notableFlight, STS-118]
Generated description
STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-118
Target entity description: STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • A. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • B. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • C. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • D. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • E. STS-108
    STS-108 was a NASA Space Shuttle Endeavour mission in December 2001 that delivered supplies and a new crew to the International Space Station as part of the ISS assembly and logistics program.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9424514819086e9c58adde6652d completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeed35e2d081908b5d87c7630e7ffc completed March 9, 2026, 3:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69b55614ffa48190b15a1c2ec20638f2 completed March 14, 2026, 12:35 p.m.
NEDg Description generation batch_69b556dd4c4c819082c08f0278f174a3 completed March 14, 2026, 12:38 p.m.
NED2 Entity disambiguation (via description) batch_69b557e929088190878c9af98207f64a completed March 14, 2026, 12:43 p.m.
Created at: March 9, 2026, 3:22 p.m.