Triple

T3911419
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle ISS assembly flights E87328 entity
Predicate notableFlight P22 FINISHED
Object STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
E405673 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-117 | Statement: [Space Shuttle ISS assembly flights, notableFlight, STS-117]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-117
Context triple: [Space Shuttle ISS assembly flights, notableFlight, STS-117]
  • A. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • B. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • C. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • D. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • E. STS-127
    STS-127 was a 2009 NASA Space Shuttle Endeavour mission to the International Space Station that delivered and assembled key components of Japan’s Kibo laboratory.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-117
Triple: [Space Shuttle ISS assembly flights, notableFlight, STS-117]
Generated description
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-117
Target entity description: STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • A. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • B. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • C. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • D. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • E. STS-127
    STS-127 was a 2009 NASA Space Shuttle Endeavour mission to the International Space Station that delivered and assembled key components of Japan’s Kibo laboratory.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9424514819086e9c58adde6652d completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeed35e2d081908b5d87c7630e7ffc completed March 9, 2026, 3:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69b54c34527c8190a43bcc45acbe9a3d completed March 14, 2026, 11:53 a.m.
NEDg Description generation batch_69b54ca1cda48190950e3e9d14f84c94 completed March 14, 2026, 11:55 a.m.
NED2 Entity disambiguation (via description) batch_69b54d1a46b08190a79b1bd44eb60ee9 completed March 14, 2026, 11:57 a.m.
Created at: March 9, 2026, 3:22 p.m.