Triple
T3900373
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | RTCA |
E90473
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical assistance program |
C12097
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical assistance program Context triple: [RTCA, instanceOf, technical assistance program]
-
A.
technical commission
A technical commission is a specialized group of experts formally appointed to study, evaluate, and provide recommendations on complex technical or scientific matters within a specific domain.
-
B.
technical advisory mechanism
chosen
A technical advisory mechanism is a structured process or body that provides expert, evidence-based guidance to inform decision-making, policy development, or implementation in a specific technical domain.
-
C.
technical commission system
A technical commission system is a structured framework of processes, tools, and governance used to plan, execute, verify, and document the commissioning and performance validation of technical systems or facilities.
-
D.
technical code
Technical code is a structured set of machine-readable instructions, written in a specific programming language, that implements precise computational logic and system behavior according to defined technical requirements.
-
E.
software
Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed95d315881908cbf1bf4a7215fbf |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:21 p.m.