Triple

T3873561
Position Surface form Disambiguated ID Type / Status
Subject Hamilton E92442 entity
Predicate roadConnection P385 FINISHED
Object State Highway 1 E427340 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Highway 1 | Statement: [Hamilton, roadConnection, State Highway 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Highway 1
Context triple: [Hamilton, roadConnection, State Highway 1]
  • A. State Highway 1 chosen
    State Highway 1 is New Zealand’s primary national highway, running the length of the country and connecting major cities and regions from north to south.
  • B. Highway 1
    Highway 1 is a primary east–west transportation route in Canada that forms part of the Trans-Canada Highway system.
  • C. California State Route 1
    California State Route 1 is a scenic coastal highway in California renowned for its dramatic ocean views and cliffside stretches along the Pacific coast.
  • D. Pacific Coast Highway
    Pacific Coast Highway is a famed scenic roadway along the California coastline, renowned for its dramatic ocean views and picturesque coastal towns.
  • E. U.S. Route 101
    U.S. Route 101 is a major north–south U.S. highway running along the West Coast, particularly known for following much of the California and Oregon coastline and serving as a key scenic and transportation corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed967448c819086c4b358d37b25aa completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeec581adc81909219e6f025fc97c2 completed March 9, 2026, 3:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5d044ec6c81909e2abcb8c429045a completed March 14, 2026, 9:16 p.m.
Created at: March 9, 2026, 3:20 p.m.