Triple
T3871080
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Niagara Falls AC power project |
E92386
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | alternating current power system |
C7916
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: alternating current power system Context triple: [Niagara Falls AC power project, instanceOf, alternating current power system]
-
A.
power system
chosen
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
balance of power system
A balance of power system is an international relations arrangement in which states form shifting alliances and counterweights so that no single actor becomes dominant enough to threaten the independence or security of the others.
-
C.
electric motor
An electric motor is a device that converts electrical energy into mechanical rotational energy through the interaction of magnetic fields and current-carrying conductors.
-
D.
electrical resonant transformer circuit
An electrical resonant transformer circuit is a tuned system of inductors and capacitors that transfers energy efficiently at a specific resonant frequency, often used to generate high voltages or enable wireless power transfer.
-
E.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed967448c819086c4b358d37b25aa |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:20 p.m.