Triple

T3868785
Position Surface form Disambiguated ID Type / Status
Subject Kentucky Lock E91926 entity
Predicate instanceOf P0 FINISHED
Object inland waterway lock C3519 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: inland waterway lock
Context triple: [Kentucky Lock, instanceOf, inland waterway lock]
  • A. canal lock chosen
    A canal lock is a gated chamber in a waterway that raises or lowers boats between stretches of water at different levels by controlling the water height within the enclosure.
  • B. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • C. movable bridge
    A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
  • D. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • E. vertical-lift bridge
    A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9645f348190a9868e7cef56ab7e completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:20 p.m.