Triple

T38683943
Position Surface form Disambiguated ID Type / Status
Subject Kiger Gorge E949063 entity
Predicate instanceOf P0 FINISHED
Object glacial canyon C14881 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glacial canyon
Context triple: [Kiger Gorge, instanceOf, glacial canyon]
  • A. mountain gully chosen
    A mountain gully is a narrow, steep-sided channel carved into a mountainside by concentrated runoff and erosion, often carrying water and debris during heavy rains or snowmelt.
  • B. glacier
    A glacier is a massive, persistent body of dense ice that forms on land from accumulated snowfall and slowly flows under its own weight, reshaping the landscape over time.
  • C. glacial fjord system
    A glacial fjord system is a coastal landscape formed where glaciers carve deep, steep-sided valleys that are later flooded by the sea, creating interconnected basins, sills, and channels with distinct physical, chemical, and ecological characteristics.
  • D. glacial icefall
    A glacial icefall is a steep, chaotic section of a glacier where flowing ice breaks into crevasses and towering seracs as it moves rapidly over a sharp drop in the underlying terrain.
  • E. submarine canyon
    A submarine canyon is a steep-sided underwater valley incised into the continental shelf and slope, often extending from the mouth of a river and serving as a major pathway for transporting sediments from shallow to deep ocean basins.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76efe16148190befd5dd59c3dfeaa completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:33 p.m.