Triple
T38650981
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Novogireevskaya Street |
E939744
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport thoroughfare |
C66460
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport thoroughfare Context triple: [Novogireevskaya Street, instanceOf, transport thoroughfare]
-
A.
civic thoroughfare
A civic thoroughfare is a major public street or corridor designed to accommodate high volumes of movement while structuring and showcasing key civic, cultural, and institutional functions of a community.
-
B.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
C.
riverside thoroughfare
A riverside thoroughfare is a road, path, or promenade that runs alongside a river, facilitating transportation, access, and recreational use of the waterfront.
-
D.
east–west thoroughfare
An east–west thoroughfare is a primary transportation route or street that runs predominantly in an east–west direction, facilitating significant cross-town or regional movement.
-
E.
major thoroughfare
A major thoroughfare is a primary, high-capacity road or route designed to carry large volumes of traffic efficiently between key areas within or between urban regions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ede49648190a48bfe47032a05a3 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:33 p.m.