Triple

T38646612
Position Surface form Disambiguated ID Type / Status
Subject National Baseball Hall of Fame screening committee E938733 entity
Predicate instanceOf P0 FINISHED
Object selection panel C5002 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: selection panel
Context triple: [National Baseball Hall of Fame screening committee, instanceOf, selection panel]
  • A. selection committee chosen
    A selection committee is a group of individuals formally tasked with evaluating candidates or proposals against defined criteria to choose the most suitable options.
  • B. sidebar panel
    A sidebar panel is a vertically oriented user interface component that provides secondary navigation, tools, or contextual information alongside the main content area.
  • C. panel show
    A panel show is a television or radio program format in which a group of regular or guest participants discuss topics, answer questions, or play games, typically moderated by a host.
  • D. selection process
    The selection process is a systematic series of steps used to evaluate and choose the most suitable option(s) from a pool of candidates or alternatives based on predefined criteria.
  • E. investigative panel
    An investigative panel is a formally constituted group of individuals tasked with examining specific issues, incidents, or allegations to establish facts and provide findings or recommendations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed948ec81908ce7811608a8f359 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.