Triple

T38643863
Position Surface form Disambiguated ID Type / Status
Subject Mythic+ dungeons E938668 entity
Predicate instanceOf P0 FINISHED
Object endgame dungeon system C30188 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: endgame dungeon system
Context triple: [Mythic+ dungeons, instanceOf, endgame dungeon system]
  • A. endgame raid
    An endgame raid is a high-difficulty, coordinated multiplayer encounter designed for max-level players that typically requires advanced gear, teamwork, and strategy to complete.
  • B. dungeon crawler
    A dungeon crawler is a game or narrative focused on exploring labyrinthine environments filled with monsters, traps, and treasure, emphasizing combat, resource management, and incremental character progression.
  • C. endgame content chosen
    Endgame content refers to the advanced activities, challenges, and progression systems available to players after completing a game's main storyline or reaching maximum level.
  • D. Dungeon structure
    A dungeon structure is an interconnected layout of rooms, corridors, and features designed to constrain movement, create challenges, and support exploration or encounters within a confined environment.
  • E. role-playing game engine
    A role-playing game engine is a software framework that provides the core systems—such as character progression, combat mechanics, dialogue, inventory, and world interaction—needed to build and run role-playing games.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed948ec81908ce7811608a8f359 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.