Triple

T3863541
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 219 E91795 entity
Predicate abbreviation P43 FINISHED
Object GA 219
GA 219 is a state highway in Georgia that serves as a regional connector route through west-central parts of the state.
E395414 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GA 219 | Statement: [Georgia State Route 219, abbreviation, GA 219]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GA 219
Context triple: [Georgia State Route 219, abbreviation, GA 219]
  • A. GA-1
    GA-1 is the abbreviated designation for Georgia State Route 1, a major north–south state highway running through western Georgia.
  • B. GA 16
    GA 16 is a state highway in Georgia that runs east–west across the central part of the state, connecting several towns and major routes.
  • C. GA 55
    GA 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • D. GA 54
    GA 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas south of Atlanta.
  • E. GA 400
    GA 400 is a major north–south freeway in Georgia that connects downtown Atlanta with its northern suburbs and exurbs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: GA 219
Triple: [Georgia State Route 219, abbreviation, GA 219]
Generated description
GA 219 is a state highway in Georgia that serves as a regional connector route through west-central parts of the state.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: GA 219
Target entity description: GA 219 is a state highway in Georgia that serves as a regional connector route through west-central parts of the state.
  • A. GA-1
    GA-1 is the abbreviated designation for Georgia State Route 1, a major north–south state highway running through western Georgia.
  • B. GA 16
    GA 16 is a state highway in Georgia that runs east–west across the central part of the state, connecting several towns and major routes.
  • C. GA 55
    GA 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • D. GA 54
    GA 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas south of Atlanta.
  • E. GA 400
    GA 400 is a major north–south freeway in Georgia that connects downtown Atlanta with its northern suburbs and exurbs.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9645f348190a9868e7cef56ab7e completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeec3871d881909c6c8e6d08203801 completed March 9, 2026, 3:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5123ad9188190a158721a6192cdae completed March 14, 2026, 7:46 a.m.
NEDg Description generation batch_69b51336c5f8819096b0b6cee47e48e3 completed March 14, 2026, 7:50 a.m.
NED2 Entity disambiguation (via description) batch_69b513b11dcc8190a2c2e3f27b4cf25e completed March 14, 2026, 7:52 a.m.
Created at: March 9, 2026, 3:19 p.m.