Triple

T38628462
Position Surface form Disambiguated ID Type / Status
Subject Peoria station E937380 entity
Predicate instanceOf P0 FINISHED
Object transport infrastructure in Colorado C3584 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport infrastructure in Colorado
Context triple: [Peoria station, instanceOf, transport infrastructure in Colorado]
  • A. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. Colorado State Highway
    A Colorado State Highway is a numbered public roadway maintained by the state of Colorado that facilitates regional and intrastate transportation between cities, towns, and key destinations within the state.
  • C. rail transportation infrastructure chosen
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • D. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • E. transport infrastructure name
    A transport infrastructure name identifies a specific facility or network element used for the movement of people or goods, such as a road, railway line, airport, or port.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed5ca3c81909288f61fbf37b359 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.