Triple

T38611233
Position Surface form Disambiguated ID Type / Status
Subject Malcolm Whitman E934484 entity
Predicate turnedProStatus P9282 FINISHED
Object amateur tour LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: amateur tour | Statement: [Malcolm Whitman, turnedProStatus, amateur tour]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: turnedProStatus
Context triple: [Malcolm Whitman, turnedProStatus, amateur tour]
  • A. turnedPro chosen
    Indicates that an individual transitioned from amateur status to professional status in a particular field or activity.
  • B. submissionStatus
    Indicates the current state or phase of a submitted item within a review or processing workflow.
  • C. laterStatus
    Indicates that one entity represents a subsequent or resulting status or condition of another entity in time.
  • D. statusTransmission
    Indicates that a status or state is being communicated or passed from one entity to another.
  • E. enteredStatus
    Indicates that an entity has transitioned into or assumed a particular status or state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eccd6d081909ccce171011739a1 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fcdb0de8c08190928cd1323f80ab5c completed May 7, 2026, 6:33 p.m.
PD Predicate disambiguation batch_69fcd9017dd88190b32a73fe78909740 completed May 7, 2026, 6:25 p.m.
Created at: May 3, 2026, 4:32 p.m.