Triple

T38602968
Position Surface form Disambiguated ID Type / Status
Subject One City, Nine Towns E934265 entity
Predicate instanceOf P0 FINISHED
Object Shanghai municipal project C54552 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Shanghai municipal project
Context triple: [One City, Nine Towns, instanceOf, Shanghai municipal project]
  • A. Shanghai municipal designation chosen
    A Shanghai municipal designation is an official classification or status conferred by the Shanghai city government to identify, regulate, or recognize specific entities, areas, or initiatives within its jurisdiction.
  • B. district of Shanghai
    A district of Shanghai is an administrative subdivision of the Shanghai municipality that governs a specific urban or suburban area, providing local services, infrastructure, and regulation.
  • C. Shanghai Metro depot
    A Shanghai Metro depot is a specialized facility where metro trains are stored, inspected, maintained, and dispatched to support the operation of the Shanghai subway network.
  • D. New York City Subway infrastructure project
    A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
  • E. district of Chongqing
    A district of Chongqing is an administrative subdivision of the Chongqing municipality in China, functioning as a local governing unit responsible for regional governance, public services, and economic development within its designated urban or rural area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ecc17688190b389b693a5927501 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.