Triple
T38602609
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gil Puyat station |
E934255
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | LRT Line 1 station |
C61947
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: LRT Line 1 station Context triple: [Gil Puyat station, instanceOf, LRT Line 1 station]
-
A.
Manila LRT Line 1 station
chosen
A Manila LRT Line 1 station is a designated passenger facility along Line 1 of the Manila Light Rail Transit system that provides platforms, ticketing services, and access points for boarding and alighting trains within the network.
-
B.
Pink Line station
A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
-
C.
Manila LRT Line 2 station
A Manila LRT Line 2 station is a designated passenger facility along Line 2 of the Manila Light Rail Transit system that provides platforms, ticketing, and access points for boarding and alighting trains.
-
D.
MRT station
An MRT station is a designated public transit facility where passengers access, board, and alight mass rapid transit trains, typically featuring platforms, ticketing systems, and connections to surrounding urban infrastructure.
-
E.
RTA Red Line station
An RTA Red Line station is a designated stop along the Red Line rapid transit route where passengers can board, alight, and transfer between trains and other connecting transportation services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ecc17688190b389b693a5927501 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:32 p.m.