Triple
T38579892
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Samish River–Samish Bay watershed |
E929512
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal drainage basin |
C1429
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal drainage basin Context triple: [Samish River–Samish Bay watershed, instanceOf, coastal drainage basin]
-
A.
drainage basin
chosen
A drainage basin is a land area where all precipitation collects and drains off into a common outlet, such as a river, lake, or ocean.
-
B.
coastal floodplain
A coastal floodplain is a low-lying, relatively flat land area adjacent to a coast that is periodically inundated by seawater due to tides, storm surges, or sea-level rise.
-
C.
coastal region
A coastal region is a geographic area where land meets the ocean or sea, characterized by unique environmental, economic, and cultural features shaped by its proximity to the shoreline.
-
D.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
-
E.
coastal passage
A coastal passage is a navigable route that follows along a shoreline, often using natural channels and sheltered waters between the coast and offshore features such as islands or reefs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ebd2248819083978362d81fa35e |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:32 p.m.