Triple

T38561317
Position Surface form Disambiguated ID Type / Status
Subject Multihalle in Mannheim E928082 entity
Predicate instanceOf P0 FINISHED
Object lightweight structure C64587 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lightweight structure
Context triple: [Multihalle in Mannheim, instanceOf, lightweight structure]
  • A. lightweight membrane structure chosen
    A lightweight membrane structure is a building system that uses tensioned, thin, flexible materials supported by a minimal framework to create large-span, efficient, and often translucent enclosures.
  • B. very light jet
    A very light jet is a small, lightweight business jet designed for short-range travel, typically seating 4–8 passengers and operable by a single pilot with lower operating costs than larger jets.
  • C. light metro
    A light metro is a grade-separated, medium-capacity urban rail transit system that uses smaller trains and shorter headways than full-scale metros to efficiently serve moderate-demand corridors.
  • D. gravity-based structure
    A gravity-based structure is a massive, stable construction that relies primarily on its own weight and the force of gravity, rather than anchors or piles, to resist external loads and remain securely in place.
  • E. brick structure
    A brick structure is a constructed form made primarily from individual clay or concrete bricks bonded together, typically with mortar, to create durable walls, buildings, or other architectural elements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb8d1808190a588af29d8b266d6 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.