Triple
T38555752
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lowestoft Lake Lothing Third Crossing |
E925239
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road bridge project |
C61507
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road bridge project Context triple: [Lowestoft Lake Lothing Third Crossing, instanceOf, road bridge project]
-
A.
bridge replacement project
A bridge replacement project is a coordinated planning, design, and construction effort to remove an existing bridge and build a new structure that meets current safety, capacity, and regulatory standards.
-
B.
highway bridge
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
C.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
D.
bridge construction program
chosen
A bridge construction program is a coordinated set of projects, resources, and processes designed to plan, design, and build one or more bridges to meet specified functional, safety, budget, and schedule objectives.
-
E.
road and rail bridge
A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eaeb69c8190b367df9330d6f6af |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:32 p.m.