Triple

T38555752
Position Surface form Disambiguated ID Type / Status
Subject Lowestoft Lake Lothing Third Crossing E925239 entity
Predicate instanceOf P0 FINISHED
Object road bridge project C61507 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road bridge project
Context triple: [Lowestoft Lake Lothing Third Crossing, instanceOf, road bridge project]
  • A. bridge replacement project
    A bridge replacement project is a coordinated planning, design, and construction effort to remove an existing bridge and build a new structure that meets current safety, capacity, and regulatory standards.
  • B. highway bridge
    A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
  • C. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • D. bridge construction program chosen
    A bridge construction program is a coordinated set of projects, resources, and processes designed to plan, design, and build one or more bridges to meet specified functional, safety, budget, and schedule objectives.
  • E. road and rail bridge
    A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eaeb69c8190b367df9330d6f6af completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.