Triple

T38553378
Position Surface form Disambiguated ID Type / Status
Subject Newhaven Harbour E925172 entity
Predicate instanceOf P0 FINISHED
Object former ferry port C16030 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former ferry port
Context triple: [Newhaven Harbour, instanceOf, former ferry port]
  • A. former port city
    A former port city is an urban settlement that once functioned as a significant maritime trade hub but has since lost its port operations or primary seafaring role due to economic, environmental, or infrastructural changes.
  • B. former ferry
    A former ferry is a vessel that previously operated as a passenger or vehicle transport across a body of water but has since been retired, repurposed, or decommissioned from regular ferry service.
  • C. former port facility chosen
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • D. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • E. ferry terminal town
    A ferry terminal town is a settlement whose identity and economy are centered around a ferry port that serves as a primary hub for transportation, commerce, and connection to other regions across a body of water.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eaeb69c8190b367df9330d6f6af completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.