Triple

T38539918
Position Surface form Disambiguated ID Type / Status
Subject Qiongzhou Strait fixed link E924803 entity
Predicate instanceOf P0 FINISHED
Object proposed transport link C22890 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposed transport link
Context triple: [Qiongzhou Strait fixed link, instanceOf, proposed transport link]
  • A. ground transportation link
    A ground transportation link is a physical connection, such as a road, rail line, or dedicated corridor, that enables the movement of people or goods between two or more locations on land.
  • B. proposed bridge chosen
    A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
  • C. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • D. planned transit project
    A planned transit project is a proposed public transportation initiative, such as a new route, line, or facility, that is formally defined and scheduled but not yet constructed or in operation.
  • E. planned public transit line
    A planned public transit line is a proposed, not-yet-built transportation route with defined stops, alignment, and service characteristics intended for future public operation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eadeac081909cdfdd0474cb6765 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.