Triple
T38539918
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Qiongzhou Strait fixed link |
E924803
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | proposed transport link |
C22890
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: proposed transport link Context triple: [Qiongzhou Strait fixed link, instanceOf, proposed transport link]
-
A.
ground transportation link
A ground transportation link is a physical connection, such as a road, rail line, or dedicated corridor, that enables the movement of people or goods between two or more locations on land.
-
B.
proposed bridge
chosen
A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
-
C.
planned transit corridor
A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
-
D.
planned transit project
A planned transit project is a proposed public transportation initiative, such as a new route, line, or facility, that is formally defined and scheduled but not yet constructed or in operation.
-
E.
planned public transit line
A planned public transit line is a proposed, not-yet-built transportation route with defined stops, alignment, and service characteristics intended for future public operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eadeac081909cdfdd0474cb6765 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:32 p.m.