Triple

T38533833
Position Surface form Disambiguated ID Type / Status
Subject Tretyakovskaya–Novokuznetskaya transfer passage E923442 entity
Predicate instanceOf P0 FINISHED
Object metro transfer corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metro transfer corridor
Context triple: [Tretyakovskaya–Novokuznetskaya transfer passage, instanceOf, metro transfer corridor]
  • A. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • B. metro train
    A metro train is an electrically powered, multi-car rail vehicle designed to transport large numbers of passengers quickly and frequently along dedicated urban and suburban transit lines.
  • C. suburban railway corridor
    A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
  • D. metro network
    A metro network is an interconnected system of urban rail lines, stations, and supporting infrastructure designed to transport large numbers of passengers efficiently within and around a city.
  • E. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ea8f6348190a5c03fb6292bbee3 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:32 p.m.