Triple

T3852278
Position Surface form Disambiguated ID Type / Status
Subject Neutral Buoyancy Laboratory E85323 entity
Predicate instanceOf P0 FINISHED
Object astronaut training facility C4504 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: astronaut training facility
Context triple: [Neutral Buoyancy Laboratory, instanceOf, astronaut training facility]
  • A. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • B. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • C. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • D. spaceflight center chosen
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • E. space launch facility
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed936de1c81908f91bed80f70abb2 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:19 p.m.