Triple

T3852182
Position Surface form Disambiguated ID Type / Status
Subject JSC E85321 entity
Predicate instanceOf P0 FINISHED
Object human spaceflight center C4504 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: human spaceflight center
Context triple: [JSC, instanceOf, human spaceflight center]
  • A. spaceflight center chosen
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • B. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • C. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • D. human spaceflight program
    A human spaceflight program is an organized, long-term governmental or commercial initiative that designs, funds, and operates crewed missions beyond Earth’s atmosphere for exploration, research, and related objectives.
  • E. space-grant institution
    A space-grant institution is a college or university designated under the U.S. National Space Grant College and Fellowship Program to promote education, research, and public outreach in space-related fields.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed936de1c81908f91bed80f70abb2 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:19 p.m.