Triple

T3850523
Position Surface form Disambiguated ID Type / Status
Subject London Gatwick Airport E85283 entity
Predicate hasTerminal P182 FINISHED
Object North Terminal E118554 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Terminal | Statement: [London Gatwick Airport, hasTerminal, North Terminal]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Terminal
Context triple: [London Gatwick Airport, hasTerminal, North Terminal]
  • A. North Terminal chosen
    North Terminal is one of the two main passenger terminals at London Gatwick Airport, handling a large share of the airport’s domestic and international flights.
  • B. North Terminal
    North Terminal is one of the main passenger terminals at Miami International Airport, serving numerous domestic and international flights with extensive airline and traveler facilities.
  • C. North Terminal
    North Terminal is the main modern passenger terminal complex at Louis Armstrong New Orleans International Airport, housing most airline operations and traveler amenities.
  • D. North Terminal
    North Terminal is one of the main passenger terminals at Piarco International Airport in Trinidad and Tobago, serving commercial air travelers and airline operations.
  • E. Union station
    Union Station is Toronto’s primary intercity and commuter rail hub, serving as a central transit gateway in the city’s downtown core.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed936de1c81908f91bed80f70abb2 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeebcf67788190975105131baabc4b completed March 9, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69b504172d58819089d19f5cb7b803ec completed March 14, 2026, 6:45 a.m.
Created at: March 9, 2026, 3:19 p.m.