Triple
T3849250
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | China–Pakistan Economic Corridor |
E85249
|
entity |
| Predicate | includes |
P1393
|
FINISHED |
| Object |
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
|
E392773
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Karot Hydropower Project | Statement: [China–Pakistan Economic Corridor, includes, Karot Hydropower Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Karot Hydropower Project Context triple: [China–Pakistan Economic Corridor, includes, Karot Hydropower Project]
-
A.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
B.
Karuma Hydropower Station
Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
-
C.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
D.
Upper Karnali Hydropower Project
The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
-
E.
Hidroituango hydroelectric project
The Hidroituango hydroelectric project is a major dam and power plant development in Colombia, designed to be the country’s largest source of hydroelectric energy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Karot Hydropower Project Triple: [China–Pakistan Economic Corridor, includes, Karot Hydropower Project]
Generated description
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Karot Hydropower Project Target entity description: The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
-
A.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
B.
Karuma Hydropower Station
Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
-
C.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
D.
Upper Karnali Hydropower Project
The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
-
E.
Hidroituango hydroelectric project
The Hidroituango hydroelectric project is a major dam and power plant development in Colombia, designed to be the country’s largest source of hydroelectric energy.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed936de1c81908f91bed80f70abb2 |
completed | March 9, 2026, 2:29 p.m. |
| NER | Named-entity recognition | batch_69aeebcde86081908cf3840ae002acfa |
completed | March 9, 2026, 3:48 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b504172d58819089d19f5cb7b803ec |
completed | March 14, 2026, 6:45 a.m. |
| NEDg | Description generation | batch_69b504f32da48190a561cc72f0c4e827 |
completed | March 14, 2026, 6:49 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69b5064192a48190a0f95dee872437e0 |
completed | March 14, 2026, 6:54 a.m. |
Created at: March 9, 2026, 3:19 p.m.