Triple

T38491916
Position Surface form Disambiguated ID Type / Status
Subject reservas ecológicas de Ecuador E918073 entity
Predicate marcoDeGestión P4839 FINISHED
Object planes de manejo aprobados por el Estado ecuatoriano LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: planes de manejo aprobados por el Estado ecuatoriano | Statement: [reservas ecológicas de Ecuador, marcoDeGestión, planes de manejo aprobados por el Estado ecuatoriano]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: marcoDeGestión
Context triple: [reservas ecológicas de Ecuador, marcoDeGestión, planes de manejo aprobados por el Estado ecuatoriano]
  • A. managementApproach chosen
    Indicates the strategy, methods, or style used to direct, organize, and oversee the activities or resources of an entity or process.
  • B. managementPlanningTool
    Indicates that an entity is a tool or system used to support, organize, or execute management planning activities for another entity or process.
  • C. managementIs
    Indicates that one entity holds a managerial role, responsibility, or authority over another entity.
  • D. managingFor
    Indicates that one entity is responsible for directing, supervising, or overseeing activities, resources, or operations on behalf of another entity.
  • E. managementPlanSpecifies
    Indicates that a management plan explicitly defines or details specific actions, procedures, or conditions to be followed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e9894208190a129a553a60ca58c completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fcd313e61c8190b174b331365b803f completed May 7, 2026, 5:59 p.m.
PD Predicate disambiguation batch_69fcd1f6b2e08190bf0300ae7c9ae67a completed May 7, 2026, 5:55 p.m.
Created at: May 3, 2026, 4:31 p.m.